Casestudies Loseley Ice Cream Factory


Loseley Ice Cream Factory

Client/Building Owner: Loseley Ice Cream

Architect: Loseley Ice Cream

System Manufacturer: Eurobond Laminates

Contractor: Laing

Cladding contractor: Colsec

System type: Composite cold-store panels

Product: Advantica® L Control

Year: 2003

“Choosing Advantica® L Control was not a difficult decision because when running an ice cream factory hygiene is paramount. The fact that these panels are non-tainting, easy to clean and so versatile made them perfect for our environment.” 
Tim Wilson – Managing Director, Loseley

Loseley Dairy Ice Cream, the UK’s largest premium ice cream producer, based in South Wales, operates one of Europe’s most advanced facilities for the production of ice cream.

The challenge

This 80,000 sq ft capacity factory required the internal walls and ceilings of the new premises to provide a surface that delivered high levels of hygiene and anti-static properties.

The solution

Advantica® L Control is safe for food contact and provides high performance surfaces and was specified for its ability to tackle bacterial cross contamination and prevent mould staining in the production environment.





Dutch We hebben automatisch uw taalinstellingen gedetecteerd