Case Studies Jaguar Land Rover Manufacturing


Jaguar Land Rover Manufacturing

The challenge

Tata Steel was contacted by Pipe Center West Bromwich to provide all tubular requirements for the M&E phase at the Jaguar Land Rover Manufacturing Centre project at Wolverhampton. The new engine plant will be home to the new family of 4-cylinder petrol and diesel engines for the luxury Land Rover brand. The overall value of the contract is £355million and the ME fit out will run to some £15million.

The solution

Tata Steel have been providing INSTALL+TM and INLINE into the project since 2012. The customer was guaranteed Tata’s premium product offering through Pipe Center on scheduled delivery requirements.

Tata Steel’s robust and reliable tubular products have earned their reputation for quality and service over many decades.

INSTALL+™ tube has a wide variety of uses in building and engineering services. These include heating and ventilation, air conditioning, compressed air and other pressure systems, as well as industrial conveyance of liquids and gases.

Dual-certified INSTALL+™(BS EN 10255 & BS EN 10217-1) tube was launched by Tata Steel to address specific issues in the market place. These relate to the demonstration of compliance with both the Construction Products Directive (CPD – 89/106/EEC) and the Pressure Equipment Directive (PED – 97/23/EC) where applicable. CE-marked in accordance with the CPD, INSTALL+™ is the professional’s choice.

As part of Tata Steel’s continuous improvement programme, INSTALL+™ has been further enhanced since its launch. It is now produced to a tighter chemical composition to deliver a higher specified minimum yield strength of 235MPa.





English We have automatically detected your language settings