Case Studies Sellafield


Sellafield

The Trisomet® 333 System has been used to overclad the Pond Hall Building at Sellafield.

The Pond Hall Building, of the Thorp Receipt and Storage Facility, houses two large water ponds as part of the reprocessing of spent uranium rods. The building is 36 metres tall and 192 metres long.

The Trisomet® 333 System panel met the performance criteria set and also offered good lifetime performance to minimise further re-cladding and meet the design life requirements for the project.

Client: Sellafield Ltd

Main contractor: Shepley Engineers Ltd 

Installation contractor: F. Brown plc

Cladding system: Trisomet® 333 System

Colorcoat® product: Double-sided Colorcoat HPS200 Ultra®