Sustainability performance at our sitesLlanwern

Llanwern Works is located to the East of Newport in South Wales and produces strip steel for UK and European markets through its hot strip, pickle line and cold mill.


Llanwern

Llanwern Works is located to the East of Newport in South Wales and produces strip steel for UK and European markets through its hot strip, pickle line and cold mill. Galvanised coating can also be applied through the site’s Zodiac line.

The site is capable of producing up to about 2,000,000 tonnes of hot rolled coil per year in a variety of finishes. The installation comprises hot rolling, cold rolling, pickling and galvanising activities. The works receives cast steel slabs by rail & road (rail being the main method of transport), which are held in slab storage yards pending processing.

Hot Rolling
When scheduled for hot rolling, the slabs are transported to the entry end of the reheat furnaces. There are five Natural Gas fired reheat furnaces, the number in use at any time being dependant of production requirement. After exiting the furnaces the slabs pass through scale breakers and a roughing section reducing thickness from 20-25cm to 28-35mm. The strip is then passed through the finishing mill reducing the strip thickness to a minimum of 1.2mm and this is coiled on down-coilers to give coils with a maximum weight of 34 tonnes. The Hot Mill coils are sold without further treatment, or can undergo further processing. The Hot mill is operated flexibly, and can be mothballed at times of lower demand. During these times hot rolled products continue to be supplied to customer requirements from other Tata Steel sites.

Pickling and Oiling
Hot rolled coils are transported for processing on the Pickle Line in order to remove the oxide scale formed during the rolling process. After exiting the final tank the strip passes through rinse & drying sections. Finishing operations including: trimming, oiling, cutting and recoiling are then undertaken prior to direct despatch or further processing.

Cold Rolling
Continuous cold reduction of hot rolled pickled steel is undertaken on a five-stand tandem mill, with the 'continuous' strip formed by welding coil ends together. Processed coils are stored pending transportation / further process, in the 'dispatch bay'. The cold mill is operated flexibly, and can be mothballed at times of lower demand. During these times cold rolled products continue to be supplied to customer requirements from other Tata Steel sites.

Galvanising
The galvanising plant (ZODIAC) takes cold rolled reduced coil and pickle coil. The strip is annealed and coated with zinc to improve surface quality, shape and metallurgical properties. Individual coils are unwound and gauge-checked prior to welding to form a continuous strip. The strip then passes to an alkali based cleaning process followed by rinsing and drying. The furnace section heats the strip to ~500°C in an oxygen free environment, then is then cooled to achieve a temperature of ~460°C prior to entry to the zinc bath coating section. Final customer specifications are met by further processing in the Galvanneal Furnace, texture milling and chromate sections.

Greenhouse gas emissions

Resource use and waste management

Water extraction

Transport impacts

Employment and skills

Local communities

Performance data

Greenhouse gas emissions

The only greenhouse gas emissions from Llanwern are emissions of carbon dioxide resulting from the combustion of natural gas in heat treatment processes. Indirectly, the site contributes to CO2 emissions associated with the consumption of electricity for conveyance, pumping, cooling etc.

Key focus areas for reduction in CO2 relate almost exclusively to the efficient use of natural gas on furnace operations. The progressive setting of stretch targets for furnace efficiencies have resulted in energy intensity performance which is considered best in class. Those involved with the improvements have received in-company accolade via a 'reward & recognition' scheme.

Llanwern is covered by a new energy efficiency governance process established within Tata Steel Europe, whereby its energy performance has been compared to a benchmark as part of a gap analysis exercise. The site has generated a series of schemes aimed at bridging the gap with best practice. Internal targets for improvement have been established and Tata Steel Europe’s Chief Technical Officer and his direct reports review the progress of each site towards these on a quarterly basis.

Back to top

Resource use and waste management

In line with our objective to reduce / eliminate wastes to landfill, Llanwern has been seeking to segregate wastes at source, to maximise recycling & recovery potential. The target for % of (general) waste recycled / recovered has been increased year on year, and is currently at 45%, with further improvements pending following roll-out of a new waste management contract.

Back to top

Water extraction

Despite the fact that Llanwern uses predominantly 'waste' water from the water treatment industry as its main process supply, there is still every incentive to use this resource efficiently (in line with our environmental policy commitment).

Over recent years, many projects have been implemented on both process & domestic supplies, to progressively (and appreciably) reduce water usage and improve efficiency. This includes an effective programme of leak detection & response.

Back to top

Transport impacts

Transport impacts are managed centrally within Tata Steel and, as such, it is not possible to disaggregate the transport impacts associated with the production and delivery of specific products from specific locations from the total estimate of Tata Steel transport impacts.

  • As shipping and logistics activities are managed centrally within Tata Steel it is not possible to disaggregate the CO2 emissions associated with the production and delivery of specific products from specific locations from the total estimate of Tata Steel transport impacts. See the general page for information on Tata Steel’s transport impacts and some of the steps we are taking to reduce these.

Back to top

Employment and skills

Tata Steel applies a common approach to employment and skills at all, of its sites. See the general page for information on what Tata Steel is doing to advance the learning and development of its employees

Back to top

Local communities

Llanwern has for many years enjoyed a strong & active relationship with the local community, and is seeking to make this relationship more sustainable by extending its sponsorship, donations, and community strategies further to local schools, charities, and sports clubs.

Steelworks have historically been perceived as being a polluting industry, with potential for nuisance & harm. However, much has changed, and we want to be viewed as a beneficial member of our community.

Back to top

Performance data

Llanwern   2014 2015 2016
CO2 emission (t) Verified EU ETS 207,060 134,621 48,236
Worldsteel scope 365,161 258,304 113,335
Water use (m³) 3,926,071 3,782,310 2,550,662
Waste disposed (t) (% of waste produced) 1,235 1% 1,048 1% 381 53%
Waste recovered (t) (% of waste produced) 131,223 99% 88,894 99% 342 47%
Justified complaints (n) 0 2 0


Emissions and consumption performance at Llanwern is very heavily influenced by the amount of production at the site in any given year.

*Reporting scope change at EU ETS phase III (2013)

Back to top