Construction
Coordination between the designer and contractor will ensure that the construction work proceeds safely and with maximum efficiency. The CDM 2007 regulations are of particular importance during the construction phase of a project.
Its is particulary important that the designer identifies how the structural stability of the steel frame is to be acheived, and any ssumptions made with regard to tmpoary stability during erection.
The decking contractor should normally prepare detailed decking drawings and an erection method statement which should identify methods of and restrictions to adjacent working. These should be discussed and agreed with the principal contractor.
Work should be planned so that no other trades or stored materials are permitted onto the deck and no other works are carried out immediately above or below the working area until it has been completed and handed over.
Tata Steel Long Products
PO Box 1
Brigg Road
Scunthorpe
North Lincolnshire DN16 1BP
United Kingdom
T +44 (0) 1724 404040
Slimdek Manual - By chapter
The manual is split into distinct sections each of which can be download separately.
Chapter 7: Construction
Chapter 7 from the Slimdek Manual gives more detail on the construction requirements Slimdek construction.