London School of Economics

Summary

The overall construction cost for the 12,600 m² floor area including auditorium space was £32 million. A minimum BREEAM rating of very good was the target for the project and it is likely that, in practice, it will achieve an ‘excellent’ rating.

Sustainability Factfile images - lse_sust_pp_1.jpgSustainability Factfile images - lse_sust_pp_2.jpg

Key Sustainability Features

  • Re-use of much of the existing steel structure and foundations 
  • Retention of the original façade
  • New steel structure provides flexible use of internal space
  • Corefast dramatically reduced the construction programme
  • Attachments have been made the core for the installation of wind turbines on the building on the future
  • Ground sourced water cooling is used to cool the lecture theatres
  • Solar hot water collectors are mounted on the roof
  • Water efficient fittings: spray taps and low flow showers, low volume flush toilets, waterless urinals
  • Minimum disturbance during construction work – energy, water and waste streams where measured and managed throughout the construction phase of the project
  • The renovation of the building is on target to achieve a BREEAM ‘Excellent’ rating.
 

Construction Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Fact file

Client

London School of Economics & Political Sciences

Architect

Grimshaw Architects

Structural Engineer

Alan Baxter Associates

Main Contractor

Geoffrey Osborne Ltd

Demolition Contractor

McGee Group Ltd

M&E Engineer

Battle McCarthy Ltd

Cost Consultant

Davis Langdon LLP