Eddie Stobart, Widnes

Eddie Stobart, Widnes

When you are one of the country’s largest, best known and most successful haulage firms, you know better than most that time is money. Employing over 5,300 people and operating some 1,850 tractor units and around 6 million square feet of high specification warehousing, Eddie Stobart moves everything from manufacturing to consumer goods.

Project Summary images - eddie_s_1tn.jpgProject Summary images - eddie_s_2tn.jpgProject Summary images - eddie_quote.gifProject Summary images - eddie_s_tn_4.jpgProject Summary images - eddie_s_tn_5.jpg

Getting these goods delivered on time sits at the heart of the business so when it came to constructing a new Recycling Facility in Widnes, the project was very much on the clock.

The project itself involves the construction of a 32,515 sq m (415,000 sq ft) chilled distribution warehouse and a 12,449 sq m (134,000 sq ft) recycling facility that includes an equipment washing unit, offices and welfare area. The recycling facility will enable Eddie Sobart to save water consumption at the site, which will have the added benefit of considerable cost savings. As such, it plays an important role in the logistical supply chain process and Eddie Stobart set a build programme of 7 months.

To facilitate the quick build time, Corus Panels and Profiles specified 12,000m2 of Trisomet® 333 System panels - its advanced insulated panel system – and 6000 m2 of 120 mm mineral wool panels for the recycling facility in Widnes.

The Corus Trisomet® 333 System comprises of a Colorcoat HPS200 Ultra® pre-finished steel outer skin, PIR insulation and a bright white internal lining providing enhanced environmental benefits together with LPC approval. The one-component system provided an attractive fast track, single fix and thermally efficient solution for the building.

The Trisomet® 333 System was specified for the development as key to the successful delivery of the project was the need to ensure the construction programme was achieved. The Trisomet® 333 System is ideally suited to fast track projects as the insulated panel system is manufactured under factory controlled conditions which enables the speed of construction to be increased, allowing the project to be completed within the required timescales, bringing overall savings in terms of cost and time.

Steve Lester, Managing Director, Lester Fabrications comments: “As well as having to achieve a very tight construction programme, which was integral to the success of the project, another important consideration was the guarantee for the building. Given the buildings close proximity to the river Mersey, the specification of the pre-finished steel was crucial to ensuring that the life expectancy of the building met with the clients brief of
30 years.”

Contact

Shotton

Deeside

Flintshire

CH5 2NH

United Kingdom


T  +44 (0) 845 30 88 330

F  +44 (0) 845 30 11 013

E  sales.theworks@ tatasteel.com

E  technical.theworks@ tatasteel.com


Fact file

Client

Eddie Stobart

Main Contractor

Pochin Construction

Installing Contractor

Lester Fabrications

Corus Cladding System

Trisomet® 333 System

Colorcoat® Product

Colorcoat HPS200 Ultra® in White

System Manufacturer

Corus Panels and Profiles

My Order

 
Account Details

No
Yes