Southgate, Glasgow

Installed - November 2005

Corefast was specified for a Scottish residential developer’s largest-ever project, the exciting Southgate scheme in Glasgow, comprising 335 apartments. Corefast helped speed up construction on site as the contractor benefited from the accuracy of the pre-installed fixings enabling rapid connections to be made to the steel frame.

Project Summary images - 1.jpgProject Summary images - 6.jpg

In the first phase of the Southgate project, which consisted of two blocks of six and seven storeys, four Corefast cores were installed in just four working days.

The project team was particularly impressed by the accuracy of Corefast’s off-site component manufacture, which delivered plumb lift shafts, with all the doors and service openings pre-cut off site. 

By selecting Corefast, the contractor was able to construct the cores with minimum disruption and benefited from a faster build sequence.

       

Construction Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Fact file

Client:

Westpoint Homes

Architect:

Young & Gault

Main Contractor:

Beechwood Development Company (Scotland) Ltd

Structural Engineer:

Goodson Associates Ltd

Steelwork Contractor:

Ellrod Engineering

Tata Steel Projects - Birmingham Office

Alpha Tower

Suffolk St

Birmingham B1 1TT

United Kingdom


T  +44 (0)121 2421240

F  +44 (0)121 2464664

E  bi-steel@ tatasteel.com


Tata Steel Projects - Birmingham Office : [View map]

My Order

 
Account Details

No
Yes