Bi-Steel

Ground-breaking Corefast project reviewed by top UK construction journal
02 Feb 2007
Birmingham 1, the striking new student halls of residence scheme now under construction in south west Birmingham, incorporates a Corefast core in the 18-storey tower.
This installation, the highest Corefast core to be erected to date, was examined in depth recently by The Structural Engineer, the top title for UK structural engineers. The article is now available to view by clicking on the PDF link on the right hand side.
Tata Steel Projects - Birmingham Office
Alpha Tower
Suffolk St
Birmingham B1 1TT
United Kingdom
T +44 (0)121 2421240
F +44 (0)121 2464664

